• 028 – 5445 1922

  • info@thapkim.com

  • 07:30 - 17:00

  • Monday to Saturday

Dakpsi 4 Hydroelectric power plant

Metallic Tower JSC undertake set up of all providing and installing hydropower mechanical equipment and pressure pipeline of factory with total volume at 617.81 tones.

Pressure pipeline and equipments are operated at construction site. With 137.5m of total length include one 3.2m diameter main conduit, splitter and 3 pipeline branches for ...

Client Công ty CP đầu tư và phát triển thủy điện Đăkpsi
Location: Huyện Tu Mơ Rông - Kon Tum
Value 1,630,000 USD
Chat Facebook